Project: Greg's_RV-10   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Greg Kochersperger   -  
Project:   Vans - RV-10
Total Hours:1327.9
Total Flight Time:1.1
Start/Last Date:Jan 15, 2021 - No Finish Date
Engine:IO-540
Propeller:TBD
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=Greg's_RV-10

Home or Last Project Picture

Oct 01, 2023     37-3: Starting fuel lines - (1.5 hours)       Category: 37: Fuel System
Brake lines all finished and on a roll so started on some fuel lines. I'm using the TCW bulkhead connections at the fuselage exit so that I can use filters at the wing roots. This means that the fuel line between the tunnel and the fuse side is a straight shot with hard points at each end. Decided to bend a little chicane in the line to relieve some stress and allow for installation. Bends came out good. Gives a little extra room for the transponder antenna connection too.

My andair fuel valve finally arrived but has the wrong engraving on the plate. Not a time critical issue but a little disappointing after waiting 5 months for it. I did go ahead and install nut plates on the fuel valve. Really nice quality part.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.